From phase to phase on evidence
- Claim
- Evidence class
- Evidence ledger
- Phase gate A validator checks the state
- Next phase
Problem
Building alone with agents produces a lot of output fast, and it is easy to move to the next phase on a hunch instead of on evidence.
Value
A builder knows at each phase what evidence is enough to move on, and the next step is decided by a rule instead of a mood.
Role
Authored the operating model, templates, agent instructions, data schema and validation rules.
- Classified every claim by the evidence behind it and tied each phase gate to the evidence it needs.
- Wrote the templates for the foundation audit, the phase gate, the product core, the active bet and the evidence ledger.
- Wrote an agent prompt for each phase and a daily router that picks the phase to work in.
- Defined the active-cycle file as a schema with a validator, so the state of a product is checked, not assumed.
Limits
- A written model with templates and a validator, not an application.
Sources
- Operating model, templates and agent prompts, version 2
- Private package, finished in August 2026